Porche TewkekburyIn conjunction with Squareone Construction M D Enertech have completed and handed over Porsche at Tewkesbury to the client, The Lovett Group. The project involved the design and build of all mechanical services including carrying out of the Sbem calculations and production of the EPC.

As a team we have now moved on to a Preparation Centre in Bristol and currently assisting with the design of Porsche Swindon.”